Hong Kong Data Center
Find the ideal location
Hong Kong Data Center
Find the ideal location
About Hong Kong
PCCW Global Data Center
The Hong Kong PCCW Global Data Center is located in the core urban area of Hong Kong Island and in close proximity to the Central Government Complex, Immigration Tower and Hong Kong Convention and Exhibition Center. The ISO 14001 certified data center is housed with several global Internet companies, telecommunication corporations and media conglomerates, including Now TV, PCCW Global and TVB News. Such carrier neutral data center employs redundant (2N) uninterruptible power supply (UPS) system, backed up by multiple units of diesel power generators, in the event of citywide power outages.
Location Feature
Prime Location The PCCW Global data center is located in Wanchai that very close to most of financial institutions and banks in Hong Kong |
Carrier Neutral Carrier-neutral data center not only allow users to enjoy network redundancy and reliability, but also reduce the cost by on infrastructure |
Redundant Network The data center is connected to many Tier 1 carriers and has served ISP, telecom and media companies for years |
Reliable Infrastructure PCCW Global data ceneter access to dual independent power lines, support N+1 CRAC, independent power supply to UPS and cooling |
Supporting Facility The PCCW Global data center also exceeds Tier 3 standards, with a loading area, parking, pantry and lounge area… |
Security PCCW Global data center have access control system and 24 hours surveillance CCTV with digital recording |
POWER SUPPLY
City Power Supply | Two Power Supply Routes to Ensure High Availability and Avoid Unexpected Power Supply Failure | |||
Power Transformers | 3 | |||
Power Supply | Uninterruptible Power Supply (UPS) and cooling system to achieve best power usage effectiveness | |||
Capacity | 2N 1MVA IT | |||
Units of Diesel Power Generator | 1000kVA to 1500kVA | |||
Backup Power Generator | Multiple Connecting to External Fuel Tank | |||
Backup Fuel Supply | Connecting to External Fuel Tank |
AIR CONDITIONING SYSTEM
Water Cooling System | Support N+1 CRAC | |||
Temperature | 22℃ ± 2 ℃ | |||
Humidity | 55% ± 10% | |||
Power Supply Cooling | Diesel Generators are used as a Backup Power Supply System | |||
Layout Design | Cold Aisle Design |
FIRE PROTECTION SYSTEM
Fire Extinguishing System | FM200 | |||
Smoke Detection | VESDA Smoke Detector | |||
Firefighting Configuration | Carbon Dioxide Fire Extinguisher | |||
Monitoring System | Temperature, Humidity and Smoke Detection | |||
Fire Alarm | Automatic Fire Alarm System is Installed and Remotely Monitored by a Fire Service Station |
DATA CENTER FACILITIES
Elevated Floor and Max Headroom | 600mm and 2.8m respectively | |||
Meet-Me-Room(MMR) -> Telecom Facilities | Exclusive Meet-Me-Room (MMR) | |||
Attributes | Carrier Neutral | |||
Related Facilties | Loading Area, Carpark, Pantry and Rest Area | |||
Ground Loading | 9.8kPa | |||
Network | Double Routing and Crossed Routing | |||
Elevators | Independent Passenger Lift and Goods Lift |
SECURITY SYSTEM
Access Control | Double Door Access Control | |||
Onsite Security | 24/7 Security Monitoring | |||
Security Monitoring | 24/7 Local and Remote Security Monitoring |